The Line's First Terminus
The Kominato Railway Satomi Station Building (小湊鉄道里見駅本屋) is a single-storey timber station built in 1925 in the Hirano district of Ichihara City, Chiba Prefecture; extended in 1932 and 1987, it was registered as a Registered Tangible Cultural Property on May 2, 2017.
Satomi lies about 2 kilometers south of Takataki. According to the company's history, the first section opened between Goi and Satomi on March 7, 1925, and Satomi remained the end of the line until the extension to Tsukizaki opened on September 1, 1926.
No Signal-Cabin Bay
The Agency for Cultural Affairs records the Kominato Railway Satomi Station Building as single-storey timber with a tiled roof and a building area of 65 square meters, built to the line's standard opening-era design.
The agency highlights one difference from the state railways' standard stations: there is no projecting bay for the block-working office, the room where staff controlled which train could enter the next section of single track. On state-railway stations that office usually jutted out toward the platform.
The agency also notes that both the interior and exterior survive in good original condition, and that the station is widely loved.
Seeing It
At the Kominato Railway Satomi Station Building, look along the platform side: the wall runs straight, without the bay a state-railway station would have. Inside, the interior finishes are worth a look as well.
In normal times Satomi is also a stop for the Satoyama Torocco tourist train. Since Typhoon No. 25 struck in September 2026, the line between Kazusa Ushiku and Kazusa-Nakano has been suspended until further notice, with no replacement buses (company statement of September 24, 2026), so for now it cannot be reached by train.
- 📍 Plan Your Visit to Chiba
- Find tours, activities & transport passes near Kominato Railway Satomi Station Building
- [ Book Tokyo Disney Resort Tickets ]
Q&A
- When was the Kominato Railway Satomi Station Building built?
- In 1925, with extensions in 1932 and 1987.
- How does the Satomi Station Building differ from state-railway stations?
- It has no projecting bay for a block-working office on the platform side.
- Was Satomi once the end of the Kominato line?
- Yes. The first section opened between Goi and Satomi on March 7, 1925, and the line reached Tsukizaki in September 1926.
- How big is the Kominato Railway Satomi Station Building?
- Its building area is 65 square meters.
- Can I visit Satomi Station now?
- Not by train. The line beyond Kazusa Ushiku has been suspended since typhoon damage in September 2026.
Basic Information
| Name | Kominato Railway Satomi Station Building (小湊鉄道里見駅本屋) |
|---|---|
| Location | 176-1 Uchidamo, Hirano, Ichihara City, Chiba Prefecture |
| Designation | Registered Tangible Cultural Property (Structure) |
| Year Designated | Registered 2017/5/2 (Heisei 29) |
| Quantity | 1 structure |
| Dimensions | Single-storey timber, tiled roof, building area 65 square meters |
| Owner | Kominato Railway Co., Ltd. |
| Public Access | Working station (section suspended after 2026 typhoon damage) |
References
- Agency for Cultural Affairs, Database of National Cultural Properties: 小湊鉄道里見駅本屋
- https://kunishitei.bunka.go.jp/heritage/detail/101/00011472
- Cultural Heritage Online: 小湊鉄道里見駅本屋
- https://online.bunka.go.jp/heritages/detail/245218
- Kominato Railway: 22 facilities registered as Registered Tangible Cultural Properties (Japanese)
- https://www.kominato.co.jp/corporate/topics/heritage/index.html
- Kominato Railway: Damage from Typhoon No. 25 and recovery outlook, September 24, 2026 (Japanese)
- https://www.kominato.co.jp/wp-content/uploads/2026/09/30216b45daba750194c363de3f54800f.pdf
- Kominato Railway: Company history (Japanese)
- https://www.kominato.co.jp/corporate/history/
Last verified: 2026.10.01